Alle ProjekteProjekt / 13

Website / Construction / Concept

Graditelj Teslić

A bold construction-company website where a pinned SVG building is drawn, built and lit on scroll.

WebsiteConcept & copy (sr)UX/UI DesignGSAP motionSVG illustrationQuote flow
Kunde / Projekt
Graditelj Teslić (concept)
Fokus
Website / Concept & copy (sr)
Standort
Teslić, Bosnia and Herzegovina

Projektüberblick

Ein fokussiertes Digitalprojekt für Klarheit, Vertrauen und Handlung.

Graditelj Teslić is a concept website for a construction company in Teslić that builds residential and commercial buildings, sells apartments and runs its own machinery. Concrete grey, charcoal and safety orange set the tone. The centrepiece is a pinned P+4 building: a blueprint draws itself, the foundation is poured, a tower crane lifts five floors, the roof, windows, balconies and facade follow, the lights come on and the drawing wipes into a real photo.

Ziel war es, das Angebot verständlicher zu machen, die Arbeit mit mehr Kontext zu zeigen und den Weg vom ersten Eindruck bis zu Kontakt, Anfrage, Buchung oder Kaufentscheidung zu vereinfachen.

Case Study

Buildings that last.

Kunde
Graditelj Teslić (concept)
Standort
Teslić, Bosnia and Herzegovina

Local builders usually have a phone number and a few photos online. This concept shows the whole job: what the company builds, how a building comes together, which machines it owns and how to ask for a quote in under a minute.

Vertrauen und Performance

6

Services

Residential and commercial buildings, apartment sales, concrete works, excavation and civil works.

8

Build phases

Blueprint, foundation, crane and floors, roof, windows, facade, lights and the real photo.

100

Desktop Lighthouse

93 to 96 on mobile, 100 for accessibility, best practices and SEO.

Die Überlegungen hinter dem Projekt

The brief

Show that one company can do the whole building.

Investors and apartment buyers in a small town compare builders by reputation. The site needed to prove capacity: own crew, own crane and machines, and a clear way of working from first site visit to handover.

Design direction

Concrete, charcoal and safety orange.

Big Shoulders Display gives the headlines the weight of site signage, while Manrope keeps details readable. Hazard-tape marquees, a measuring-tape progress bar and square buttons tie the interface to the building site without turning it into a costume.

  • Pinned building sequence drawn in SVG, with a tower crane lifting each of the five floors.
  • Services with a checklist and a measuring-tape progress indicator.
  • Filterable projects with a lightbox, a pinned horizontal machinery row and a stats band.

Quote flow

From 'what are we building?' to a message in three steps.

A sticky process timeline explains the five stages of a contract, the FAQ handles the usual objections, and the quote form asks what, where and when before preparing a WhatsApp or Viber message. No backend is needed and the visitor sees exactly what is sent.

So funktioniert es

Ein klarer Prozess vom ersten Schritt bis zum Ergebnis.

  1. 01

    Structure

    Map services, machinery and the contract process into one scroll.

  2. 02

    Illustration

    Build the P+4 building, crane and blueprint as layered SVG.

  3. 03

    Motion

    Pinned build, wipe to photo, horizontal machinery and counters.

  4. 04

    Quote

    Three-step form that prepares a WhatsApp or Viber message.

Design-Assets

Das visuelle System hinter dem Projekt.

Brand system

Leistungen

Was im Projekt enthalten war.

Website

Concept & copy (sr)

UX/UI Design

GSAP motion

SVG illustration

Quote flow

Etwas Ähnliches bauen

Sie brauchen eine Website, Web-App oder ein Redesign mit dieser Klarheit?

Schicken Sie eine kurze Nachricht zu Ihrem Unternehmen, Markt, Ihrer aktuellen Website und Ihrem Ziel. Panic Digital hilft bei Struktur, Design, Entwicklung und SEO-Grundlage für den nächsten Schritt.

Panic Digital kontaktieren
Montage Aqua Therm Projektvorschau
Nächstes Projekt

Weiter entdecken

+

Montage Aqua Therm

A German-language B2B website for an industrial assembly company that installs and commissions plastics machinery across Europe.

Nächste Case Study